Executed a Reliability Availability Maintainability (RAM) Analysis to evaluate the Availability of the SITUCHE Central Development (light oil) Project.
Investigated EnCana’s Line #4 Location: 1-3-47-10W4 failure and provided a complete written integrity assessment of the pipeline system and plan to prevent any further failures. This plan considered the pipeline condition, extent of corrosion, product carried, population density, environmental and public risk, and proposed mitigation and operational changes necessary to prevent further failures.
Executed the following for EnCana’s Pipeline 30401 – 4, 5, 6, 11, 7 in the Wainwright West Area: identification of the corrosion mechanism(s); recommendations to mitigate existing corrosion damage.
Phoenix Engineered Solutions Inc. Institute transforms mindsets and behaviors through world-class training and education, offering tailored learning experiences and certifications that drive human performance improvement and lasting operational success.