Executed a Reliability Availability & Maintainability (RAM) Analysis in the Select Stage for the Long Lake Diluent Tank Project.
Executed Sunrise Phase 2+ Project Conceptual Reliability Availability Maintainability (RAM) Analysis to validate the plant Availability and evaluate optimum CAPEX investment.
Executed a Reliability Availability Maintainability (RAM) Analysis to evaluate the Availability of various process configuration options for the Imperial Oil Aspen Steam Assisted Gravity Drainage (SAGD) Central Processing Facility (CPF). This analysis was executed in the Optimization Phase of the project.
Executed a Reliability Availability Maintainability (RAM) & Capacity Analysis to assess the Availability and provide input to the Reliability & Maintainability Philosophy for the Nabiye CSS Facility (well pads and central processing plant) during the Front End Engineering Design (FEED) Phase.
Phoenix Engineered Solutions Inc. Institute transforms mindsets and behaviors through world-class training and education, offering tailored learning experiences and certifications that drive human performance improvement and lasting operational success.